Effectiveness Assessment of Preventive and Control Measures of Safety Implementation
Keywords:
Head Race Tunnel (HRT) Construction, Hydropower, Middle Bhotekoshi, TunnelingAbstract
The objective covers the documentation of preventive and control measures implemented and assess their effectiveness. Head Race Tunnel of Middle Bhotekoshi Hydroelectric Project-102MW (MBKHEP) was selected for the study. This study has been carried out by utilizing the data collected from the duly filled semi structured questionnaires by the Employers’, Consultants’ and Contractors’ personnel. Moreover, key informant interview and focus group discussion were also used. The major causes of accident were lack of skills/ knowledge and carelessness of workers. It was responded that Personal Protective Equipment (PPE) was not sufficient. The provision of safety engineer/ officer was compiled as per contract document though safety officer was not monitoring the safety measures effectively. Drilling and blasting were the most risky activities in tunnel construction. Geological scaling, mapping and support works including wire mesh installation, rock bolting, and safety shot circuit were also the equally risky activities in the tunnel construction. The medical examination practice of the workers was lacking at site. Till July 2017 only one accident was occurred inside Head Race Tunnel due to fall from working platform with minor injury. It was free from fatality and death. Average absenteeism due to health problem and accident was only 1.81 days per month and hence, preventive and control measures used can be regarded as effective. The management commitment to the health and safety along with worker participation are essential for successful construction project. Preventive and control measures should be planned and implemented as per the risk level of hazards.
How to cite this article: Mishra AK, Lama C, Sah DP et al. Effectiveness Assessment of Preventive and Control Measures of Safety Implementation. J Adv Res Civil Envi Engr 2019; 6(2): 1-20.
DOI: https://doi.org/10.24321/2393.8307.201903
References
2. Public Procurement Monitoring Office (PPMO). General Condition of Contract, Section-VII in NCB. PPMO. 2007.
3. CBS, 2009. Nepal Labour Force Survey 2008. Central Bureau of Statistics, Kathmandu, Nepal.
4. GON, Department of Labour. Labour Act. GON, Department of Labour. 1992.
5. GON, Department of Urban Development and Building Figure 11.Degree of challenge to implement safety
measures at site Construction. National Building code (NBC 114:1994). Construction Safety. GON, Department of Urban Development and Building Construction. 1994.
6. Risk Assessment. UK, Health & Safety Executive (HSE), HSE, 2015. Managing Health & Safety in Construction,
Construction Regulation 2015. Regulation. Health & Safety Executive (HSE). 2015.
7. ILO, International Labour Standards on Occupational Safety and Health. International Labour Standards on
Occupational Safety and Health, ILO. 1919.
8. ILO, Introduction to Occupational Health and Safety. International Labour Organization, 1996.
9. ILO, Decent Construction Work in Nepal. International Labour Organisation. Katmandu, Nepal. 2003.
10. Lamont DR. no date. ‘Health and Safety and Risk Management in Tunnelling’. OSHA3302-09R, US Department of Labor. Occupational Safety & Health Administration. (OSHA), OSHA 3302-09R. US Department of Labor. 2014.
11. Pingle S. Occupational Safety and Health in India. Public Procurement Monitoring Office (PPMO), 2007. General Condition of Contract, Section- VII in NCB. PPMO. 2012.
12. Pun KR. Occupational Safety and Health Situation in Industrial Sector in Nepal. 2011. [Online] Available
at: www.scribd.com/doc/50002585[Assessed 16th July 2017]
13. Rantanen, J., 2005. Basic Occupational Health Services: Strategy, Structures, Activities, Resources. Helsinki:
World Health Organization.
14. Rimal B, Upadhyay U, Gautam R. Search for Alternatives. Kathmandu: General Federation of Nepalese Trade
Unions. 2003.
15. Lama C, Sah DP, Mishra AK. Occupational Hazards Identification and Their Risk Assessment during the
Construction of Head Race Tunnel in Middle Bhotekoshi Hydroelectric Project. International Journal of Research-
Granthaalayah 2019; 7(3): 227-248. https://doi.org/10.5281/zenodo.2631396