Assessment of Performance of Functional and Partial Functional Water Supply Systems in Sunsari District of Nepal

Authors

  • Anjay Kumar Mishra Visiting Faculty and Management Consultant, https://orcid.org/0000-0003-2803-4918
  • Arun Kumar Karna Engineer, Water Supply and Sanitation Division Office, Jhapa, Nepal.
  • Narayan Dhakal Vice Principal, Lumbini Engineering Management and Science College, Rupandehi, Nepal.
  • Tulika Jha Advocate, Dejure Law Firm, Anamnagar, Kathmandu, Nepal.

Keywords:

Technical, Financial, Institutional, Water Quality, Community

Abstract

Only 25.4% of water supply projects are fully functional in Nepal though the target of government is to provide access to safe water supply and sanitation facilities for all. Therefore a study for comparing the performance of the functional (Itahari) and partial functional (Duhabi) water supply and sanitation project after management transfer is needed to assess the indicators to improve the status of water supply and sanitation projects. Both the projects are of Sunsari district. Purposive Sampling technic was applied based on sample size of central limit theorem. Scheduled Questionnaire Survey, Expert Consultation, Focus Group Discussion and Water Sample Test were done for primary source of data whereas reports. Journals, project reports, similar studies, books, websites and audit reports were reviewed for secondary source of data. Comparative performance of both the projects was analyzed based on technical, financial and institutional indicators. From the study it was found that pressure of flow, water demand of users, chlorine demand, and quick response of staffs, water quality and open defecation free were maintained at Itahari whereas such features were lacking in Duhabi Water Supply and Sanitation Project. It was found high tariff rate, timely payment and a business plan of Itahari WSSP was better resulting into better financial performance of the system in comparison to that of Duhabi. Based on policy in both water supply and sanitation projects 33% of women along with a vital post and marginalize group based on service area representation were found. In Itahari Water Supply Project, for per thousand of connection 3.66 staffs were appointed whereas in partial functional Duhabi Water Supply System 1.91 staffs were found for per thousand connections. Itahari WSSP had maintained a citizen charter, complaint box, information system, detailed design report, As Built Drawings, Standard Operating Process and project information’s were documented which causes the management of the system effective for implementation of reliable and satisfactory of the system whereas these things need to be improved in case of Duhabi for creating the confidence about the service.

How to cite this article: Mishra AK, Karna AK, Dhakal N et al. Assessment of Performance of Functional and Partial Functional Water Supply Systems in Sunsari District of Nepal. J Adv Res HR Organ Mqmt 2019; 6(1): 1-15.

References

1. DWSS. Design Guidelines for Community based Gravity Flow Rural Water Supply Schemes. Kathmandu: 2003.
2. DWSS. Welcome Page. Retrieved January 155, 2013. from http://dwss.gov.np/content/1/Welcome.
3. DWSS/ NMIP. Nationwide coverage and functionality Status of Water Supply and Sanitation in Nepal. Kathmandu: NMIP. 2014.
4. GON. National Policy on Rural Drinking Water Supply and Sanitation. Kathmandu: GON. 2004.
5. MoPPW. Rural Water Supply and Sanitation National Policy, 2004. Kathmandu: Ministry of Physical Planning and Works (MOPPW). 2004.
6. NEWAH. (Website). Cross Cutting Themes. Retrieved from [Online]. Available at:http://newah.org.np/index1. php?option=information&id=28.
7. NMIP. National coverage and fuctionality status of water supply and sanitation in nepal. Kathmandu: DWSS. 2014.
8. Mishra AK, Acharya SR. Performance Assessment of Salyankot Water Supply Project in Post-Earthquake Scenario of Nepal. J Adv Res GeoSci Rem Sens 2018; 5(3&4): 23-40.
9. Mishra AK. Sustainability and Risk Assessment of Salyankot Water Supply Project in Post-Earthquake Scenario.International Journal of Operations Management and Information Technology 2018; 8(1): 1-30. Available at http://www.ripublication.com.
10. Mishra AK, Rai S. Comparative performance assessment of eco-friendly buildings and conventional buildings of Kathmandu valley”, International Journal of Current Research 2017; 9(12): 62958-62973.
11. Mishra AK, Bhandari S. Performance Assessment of Ongoing Construction Projects under Town Development Fund, Nepal, Int J Adv Res Civil Stru Engr 2018; 1(1&2): 27-39.
12. Mishra AK, Shrestha M. Health and Safety Status of Casual Workers in Road Improvement Project Kathmandu Valley, Nepal, International Journal of Engineering Technology Science and Research 2017; 4(9): 1187-1199. www.ijetsr.comISSN 2394–3386.
13. Mishra AK. Assessment of Human Resource Capacity of Construction Companies in Nepal. J Adv Res Jour Mass Comm 2018; 5(4): 14-25.
14. Mishra AK. Implementation Status of Value Management in Project Management Practice in Nepal. International Journal of Management Studies 2019; 6(1): 92-108. DOI: http://dx.doi.org/10.18843/ijms/v6i1(1)/13.
15. Mishra AK, Karna AK. “Assessment of Management Transfer Process of Water Supply Systems in Sunsari District of Nepal.”International Journal of ResearchGranthaalayah 2019; 7(1): 1-24. https://doi. org/10.5281/zenodo.2550077.

Published

2019-11-21

How to Cite

Mishra, A. K., Karna, A. K., Dhakal, N., & Jha, T. (2019). Assessment of Performance of Functional and Partial Functional Water Supply Systems in Sunsari District of Nepal. Journal of Advanced Research in HR and Organizational Management, 6(1&2), 1-15. Retrieved from https://adrjournalshouse.com/index.php/Journal-HumanResourcesOrg/article/view/541