Abstract

The construction industry is one of the major aspects that support and has a significant impact on the global economy, but it is not growing as other global industries when it comes to client satisfaction issues. Nepal is, therefore, not an exception to this situation. This study examined how clients perceived local contractors’ performance in the construction of residential buildings in Pokhara, Nepal.
The main aim of this study was to analyse the degree to which clients were satisfied with the building projects that local contractors completed in Pokhara.
In this study, a questionnaire was created after consulting with experts, consultants, literature review, questionnaires were provided to clients. Based on the relative importance index the collected data were statistically analysed to determine how satisfied clients were with local contractors’ performance.
The results indicated that clients considered local contractors’ performance in the construction of residential buildings fell short of their expectations. The following aspects of the adopted groups caused the most dissatisfaction: the ability to contribute to project brief
development, site supervisor, planning and scheduling jobs, minimizing waste, efforts made by the contractor to meet specifications, personal protective equipment, labour motivation and employee devotion to contractors’ aims, deep interest in the issues and considering them as essential requests, acceptance of the client’s claims and the ability to handle variances.
Finally, it was determined that the various parties needed to communicate with one another more effectively to create a better working atmosphere that increases levels of satisfaction for clients. Furthermore, common understanding and cooperation must prevail and the contractors must enhance their practices and procedures.

How to cite this article: Adhikari R, Giri OP, Banstola P. Client’s Perception of Contractors’ Performance: A Case Study on Residential Building Construction Work at Pokhara Metropolitan City. J Adv Res Const Urban Arch 2022; 7(3&4): 40-58.

DOI: https://doi.org/10.24321/2456.9925.202204

References

Abdul Rahman H, Berawi MA, Berawi AR et al. Delay Mitigation in the Malaysian Construction Industry. Journal of Construction Engineering and Management 2006; 132: 125-33.

Abhishek A, Sutar, Mehendale AP. “Overview of Human Resource Management System in Construction Industry”. International Journal of Advanced Research and Publications 2017; 1: 81-84.

Ahmad FS, Ihtiyar A, Omar R. A comparative study on service quality in grocery retailing: Evidence from Malaysia and Turkey. Procedia - Social and Behavioral Sciences 2013; 109: 763-767.

Ahmed, Syed M, Kangari et al. “Analysis of Client Satisfaction Factors in Construction Industry.” Journal of Management in Engineering 1995; 36-44.

Ali AS, Kamaruzzaman SN. Cost performance for building construction projects in Klang Valley. Journal of Building performance 2010; 1(1).

Ali AS, Chua SJL, Lim et al. The effect of physical environment comfort on employees’ performance in office buildings: A case study of three public universities in Malaysia. Structural Survey 2015.

Aliakbarlou S, Wilkinson S, Costello SB. Rethinking client value within construction contracting services. International Journal of Managing Projects in Business 2017.

Alinaitwe H, Apolot R, Tindiwensi D. Investigation into the causes of delays and cost overruns in Uganda’s public sector construction projects. Journal of Construction in Developing Countries 2013; 18(2): 33.

Al-Momani, AH. Construction delay: a quantitative analysis. International journal of project management 2000; 18(1): 51-59.

Al-Reshaid, Khaled, Kartam. “Design-build prequalification and tendering approach for public projects.” International Journal of Project Management 2004; 23: 309-320.

Al-shorafa, RK. Analysis of clients’ needs and satisfaction in the construction industry in Gaza Strip 2008.

Anderson EW, Sullivan MW. The antecedents and consequences of customer satisfaction for firms. Marketing Science 1993; 12(2): 125-143.

Arayici, Yusuf, Aouad et al. “Computer integrated construction: An approach to requirements engineering.” Engineering, Construction, Architectural Management 2005; 12(2): 194-215.

Arslan G, Kivrak S. Critical factors to company success in the construction industry. World Academy of Science, Engineering and Technology 2008; 45(1): 43-46.

Ashley DB, Luirie CS, Jaselskis EJ. Determinants of construction project success. Project Management Journal 1987; XVII(2), 69-79.

Asiedu RO, Adaku E. Cost overruns of public sector construction projects: a developing country perspective. IJMPB 2019; 13(1): 66-84

Assaf SA, Al-Hejji S. Causes of delay in large construction projects. International Journal of Project Management 2006; 24(4): 349-357.

Peter B. “Systems and relationships for construction quality.” International Journal of Quality and Reliability Management 2000; 17(4/5): 377-392.

Beatham S, Anumba C, Thorpe T et al. KPIs: a critical appraisal of their use in construction. Benchmarking: An International Journal 2004.

Biren Patel, Prof J. J. Bhavsar and Dr. Jayeshkumar Pitroda (2017), “A Critical Literature Review of Labour Productivity in Building Construction”, International Journal of Constructive Research in Civil Engineering 2017; 3: 76-80.

Bresnen MJ, Haslam CO. Construction industry clients: a survey of their attributes and project management practices. Construction management and Economics 1991; 9(4): 327-342.

Briscoe, Geoffrey, Dainty et al. “Construction supply chain integration” 1991.

Burapharat Y, Christensen TM, Suthichoti S et al. How Service Quality Enhances Customer Satisfaction: A Case Study of Hybrid Airlines in Thailand 2021.

Chapagain D. Contract labor in Nepal. In Proceedings of the ILO Seminar 2000; 1-33.

Cheng, Jianxi, David G et al. “The satisfaction levels of UK construction clients based on the performance of consultants – Results of a case study.” Engineering, Construction, Architectural Management 2006; 13(6): 567-583.

Cheung, Sai On, Suen et al. “PPMS: A web-based construction project performance monitoring system.” Automation in Construction 2004; 13: 361-376.

Chinyio E, Alshihre F, Nzekwe-Excel C . Improving clients’ satisfaction in construction projects: The Case of Saudi Arabia 2020.

Chinyio, Ezekiel A, Olomolaiye Paul O et al. “Quantification of construction clients’ needs through paired comparisons.” Journal of Management in Engineering 1998; 14(1): 87-92.

Churchill G, Surprenant C. An Investigation into the Determinants of Customer Satisfaction. Journal of Marketing Research 1982; XIX: 491-504.

Dainty AR, Millett SJ, Briscoe GH. New perspectives on construction supply chain integration. Supply chain management: An International Journal 2001.

Duljevic M, Poturak M. Study on client-satisfaction factors in construction industry. European Journal of Economic Studies 2017; 6(2): 104-114.

Durdyev S, Ismail S, Ihtiyar A et al. A partial least squares structural equation modeling (PLS-SEM) of barriers to sustainable construction in Malaysia. Journal of Cleaner Production 2018; 204: 564-572.

Edum-fotwe F, Thorpe A, Mccaffer R. Exploring complexity in construction projects. In Project Management Advances, Training & Certification in the Mediterranean 2008.

Egemen, Mehmedali, Mohamed et al. “Clients’ needs, wants and expectations from contractors and approach to the concept of repetitive works in the Northern Cyprus construction market.” Building and Environment 2005.

Egemen, Mehmedali, Mohamed. “Different approaches of clients and consultants to contractors’ qualification and selection.” Journal of Civil Engineering and Management 2005; 6(4): 267-276.

Elavarasan S, Kamal S, Sivagamasundari R. A Review on Factors Influencing the Use of Personal Protective Equipment in Construction Projects. In Sustainable Practices and Innovations in Civil Engineering, Springer, Singapore 2022; 133-142.

Fajgelbaum P, Grossman GM, Helpman E. Income distribution, product quality, international trade. Journal of political Economy 2011; 119(4); 721-765.

Ferreira FAF, Spahr RW, Sunderman MA et al. A learning-oriented decision-making process for real estate brokerage service evaluation, Service Business 2017; 11(3): 453–474. https://doi.org/10.1007/s11628-016-0315-4

Fornell C. A national satisfaction barometer: the Swedish experience, Journal of Marketing 1992; 56: 6-21.

Forsythe P. Monitoring customer perceived service quality and satisfaction during the construction process, Construction, Economics and Building 2015; 15(1): 19-42. https://doi.org/10.5130/ajceb.v15i1.4172

Grierson S, Brennan R. Referrals for new client acquisition in professional services. Qualitative Market Research: An International Journal 2017.

Gunduz M, Nielsen Y, Özdemir M. Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey. Journal of Management in Engineering 2013:133-139.

Hanson D, Mbachu J, Nkado R. “Causes of client dissatisfaction in the South African building industry and ways of improvement: the contractors’ perspectives” 2004.

Balaji HV, M, Venugopal P. “Resource Utilization in Construction Projects and its Impacts of High Ranked Variable during Time Overrun: A Review”, Technical Research Organisation India 2017; 4: 31-35.

Hinze JW. Construction safety. Prentice Hall, Englewood Cliffs, NJ Windapo and Oladapo.

Hjelmbrekke H, Klakegg OJ, Lohne J. Governing value creation in a construction project: a new model. International Journal of Managing Projects in Business 2017.

https://pokharamun.gov.np/resource-maps cited on August 2022

https://pokharamun.gov.np cited on August 2022

Hussain K, Jing F, Junaid M et al. The dynamic outcomes of service quality: a longitudinal investigation. Journal of Service Theory and Practice 2019.

Jang, Hyounseung, Russell et al. “A project manager’s level of satisfaction in construction logistics.” Canadian Journal of Civil Engineering 2003; 30: 1133-1142.

Jin, Xiao-Hua and Ling, Florence Yean Yng. “Key relationship-based determinants of project performance in China.” Building and Environment 2006.

Johnson, Mary R, Babu RII. “Time and cost overruns in the UAE construction industry: a critical analysis.” International Journal of Construction Management, 2020; 20(5): 402-411.

Jones TO, Sasser WE. Why satisfied customers defect? Harvard Business Review 1995; 73(6): 88.

Kabul, Eka Rakhmat, Farid Yafi. “Hierarch method approach as analysis tools in forming occupational safety health management and culture.” SosiohumanioraJurnal Ilmu-ilmu Sosial dan Humaniora 2022; 24(2): 218-226.

Karna S, Junnonen JM, Kankainen J. Customer satisfaction in construction. In Proceedings of the 12th Annual Conference on Lean Construction, Helsingøv 2004; 476-488.

Sami K. “Analyzing Customer Satisfaction and Quality in Construction – the Case of Public and Private Customers.” Nordic Journal of Surveying and Real Estate Research - Special Series 2004; 2: 67-80.

Kikwasi GJ. Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building, Conference Series 2012; 1(2): 52-59

Le-Hoai L, Lee YD, Nguyen AT. Estimating time performance for building construction projects in Vietnam. KSCE Journal of Civil Engineering 2013.

Ling, Florence Yean Yng and Chong, Canny Lee Kian. “Design-and-build contractors’ service quality in public projects in Singapore.” Building and Environment 2005; 40: 815-823.

Locke EA. “The supervisor as ‘motivator’: his influence on employee performance and satisfaction”, in Bass, B.M., Cooper, R. and Haas, J.A. (Eds), Managing for Accomplishment, Heath and Company, Washington, DC, 1970: 57-67.

Loya OS. Effect of Labour efficiency losses on the time performance of construction projects (Doctoral dissertation) 2022.

Luu VT, Kim SY, Van TN et al. Quantifying schedule risk in construction projects using Bayesian belief networks. Management of Property and Construction 2009; 14(2):126-151.

Mahmoudi A, Abbasi M, Deng X et al. A novel model for risk management of outsourced construction projects using decision-making methods: a case study. Grey Systems: Theory and Application 2020; 10(2): 97-123.

Maloney. “Construction Product/Service and Customer Satisfaction.” Journal of Construction Engineering and Management 2002.

Marzouk MM, El-Rasas TI. Analyzing delay causes in Egyptian construction projects. Journal of Advanced Research 2013

Mohamed Al-Kilani, FOAD, Agung WM et al. Improving safety performance in construction projects in Libya (case study: in Tripoli city) (Doctoral dissertation, magister teknik sipil) 2011.

Mosly I. Safety performance in the construction industry of Saudi Arabia. International Journal of Construction Engineering and Management 2015; 4(6): 238-247.

Nadiri H, Gunay GN. An empirical study to diagnose the outcomes of customers’ experiences in trendy coffee shops. Journal of Business Economics and Management 2013; 14(1): 22-53.

Nagaraju SK. “Resource Management in Construction Projects – a case study”, Engineering Science and Technology: An International Journal 2012; 2: 660-665.

Bagdiya N, Wadalkar S. Defects and Post-Construction Defects Effect in Residential Building, International Journal Of Engineering Research & Technology (IJERT) 2015; 4(2). http://dx.doi.org/10.17577/IJERTV4IS020932

Nevhage B, Lindahl H. A conceptual model, methodology, tool to evaluate safety performance in an organization 2008.

Ng S, Thomas, Skitmore R et al. “Demotivating factors influencing the productivity of civil engineering projects.” International Journal of Project Management 2004; 22: 139-146.

Ng S, Thomas. “Performance of engineering consultants in ISO-9000 based quality management systems implementation.” Engineering Construction and Architectural Management 2005; 12(6): 519-532.

Niazi GA, Painting N. “Significant factors causing cost overruns in the construction industry in Afghanistan”, Procedia Engineering 2017; 182: 510-517

OECD (Organization for economic co-operation and development). Guidance for Industry, Public Authorities, Communities for developing SPI Programs related to Chemical Accident Prevention, Preparedness, Response. OECD Environment, Health and Safety Publications, Series on Chemical Accidents No. 11, 2003.

Olanrewaju SD, Ogunmakinde OE. Waste minimization strategies at the design phase: Architects’ response. Waste Management 2020; 118: 323-330.

Oliver RL. Satisfaction: A Behavioral perspective on the consumer. Routledge 2014.

Oliver RL, Rust RT, Varki S. Customer delight: foundations, findings, managerial insight. Journal of Retailing 1997; 73(3): 311-336.

Osei-Kyei R; Chan APC, Javed AA et al. Critical success criteria for public-private partnership projects: international experts’ opinion. International Journal of Strategic Property Management 2017; 21(1): 87-100.

Othman, Ayman AE, Hassan et al. “Analysis of factors that drive brief development in construction Engineering.” Construction and Architectural Management 2005; 12(1): 69-87.

Othman NA, Mydin MA. Poor Workmanship in Construction of Low-Cost Housing. Analele Universitatii’ Eftimie Murgu’, 2014; 21(1).

Parikh DV, Phugat S. Performance management in the road construction project. Int Res J Eng Technol (IRJET) 2019; 6(4)

Banstola P, Bhandari BR, Mishra AK. Assessment of Household Cement Consumption Pattern in Pokhara Metropolitan City. J Adv Res Const Urban Arch 2021; 6(1): 12-20.

Banstola P, Shrestha KK, Thapa I et al. Environmental Impacts of Concrete in Chemical Parameters of Soil. J Adv Res Civil Envi Engr 2021; 8(3&4): 9-17.

Banstola P, Shrestha, Kumar K et al. Assessment of Cement Consumption Pattern: A Case from Pokhara, Nepal. International Journal of Applied Engineering and Management Letters (IJAEML) 2021; 5(2): 26-37. DOI: http://doi.org/10.5281/zenodo.5210930

Phi Hughes, Fciosh, Rsp Chainman NEBOSH. (1995-2001), Book, Introduction to Health and Safety in Construction Projects 1995-2001.

Sadoughi A, Morefield JA, Razkenari MA et al. “The role of architects in design manufacturing-build of building industry: a case study”, In Construction Research Congress 2020: Project Management and Controls, Materials, Contracts. American Society of Civil Engineers, Reston, VA, 2020; 1358-1365

Saravanan SP. Improving safety performance in the construction industry. Journal of Chemical and Pharmaceutical Sciences 2016.

Sha MK, Shahi PB, Pandit R et al. Causes and Effects of Delays in Construction Projects. Journal of Mechanical and Civil Engineering 2017; 14(2): 52-58.

Shet SV, Patil SV, MR. Competency-based superior performance and organizational effectiveness. International Journal of Productivity and Performance Management 2019; 68(4): 753-773.

Tiwari S, Magar RB, Honnutagi A. “Resource Optimization for Sustainable Construction: The State of Art”. International Advanced Research Journal in Science, Engineering and Technology 2018; 5: 69-73.

Shrestha SK, Shrestha RK, Bhattarai SK. Text Book of Construction Management 2014.

Sijtsma K, Pfadt JM. Part II: On the use, the misuse, the very limited usefulness of Cronbach’s alpha: Discussing lower bounds and correlated errors. Psychometrika 2021; 86(4): 843-860

Smith, Jim, Love PED. “Adapting to clients’ needs in construction – A Dialogue.” MBC University Press 2001; 19(1/2): 71-78.

Soetanto R, Proverbs DG, Holt GD. Achieving quality construction projects based on harmonious working relationships with clients and architects’ perceptions of contractor performance. International Journal of Quality & Reliability Management 2001.

Sunindijo RY, Hadikusumo BH, Phangchunun T. Modeling service quality in the construction industry. International Journal of Business Performance Management 2014; 15(3): 262-276.

Tabaku E, Cerri S. An assessment of service quality and customer satisfaction in the hotel sector. Congress. Proceedings of Tourism and Hospitality Industry 2016; 480- 488.

Tejas SB. Importance of Proper Cost Management in Construction Industry. International Research Journal of Engineering and Technology 2020; 7(1): 764-766.

Tha JHM. “Towards an agent-based construction supply network modeling and simulation platform.” Automation in Construction 2005; 14: 353-359.

Thamilarasu V, Rajprasad J, Pavan RP. A case study on requirements of quality workmanship in construction projects. International Journal of Civil Engineering and Technology 2017; 8(4): 7.

Torbica ZM, Stroh RC. Customer satisfaction in homebuilding. Journal of Construction Engineering and Management, ASCE 2001; 127(1):82-6.

Tumi SAH, Omran , Pakir AHK. Causes of delay in the construction industry in Libya. In The International Conference on Economics and Administration 2009: 265-272

Valverde-Gascueña N, Navarro-Astor E, Fuentesdel-Burgo J et al. Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. Proceedings 27th Annual ARCOM Conference 2011; 879-888

Hussain W, MK Trivedi, R Kansal. “Optimisation of Construction Resource Allocation and Levelling Using Genetic Algorithm”. International Journal of Innovative Research in Science, Engineering and Technology 2015; 4: 4573-4578.

Womack JP; Jones DT, Roos D. The machine that changed the world. New York: Simon and Schuster 2008.

Wong CH, Nicholas J, Holt GD. “Using multivariate techniques for developing contractor classification models.” Engineering, Construction, Architectural Management 2003; 10(2): 99 -116.

Zeithaml VA. Consumer perceptions of price, quality, value: A means-end model and synthesis of evidence. Journal of Marketing 1988; 52: 2-22.

Published

2023-02-28