Suitable delay minimizing measures: Case Analysis of Selected Road and Bridge Projects in Various Geographical Regions of Nepal
Keywords:
Road, Bridge, Construction Contracts, Measures , AnalysesAbstract
As in many developing countries, construction projects in Nepal cover huge part of nation’s economy. However, most of the construction undertakings including the road construction do not get completed in targeted time and budgeted cost. It might be because of highly dynamic characteristics of construction projects and various factors involved in their successful completion.The aim of this study was to assess the Suitable delay minimizing measures based on Selected Road and Bridge Projects in Various Geographical Regions of Nepal. Exploring the corrective measures to mitigate the problem of delay in construction contracts in road and bridge projects was also an objective of the study. Primary data for this was obtained by using the research tool known as Key Informant Interview (KII). Superintendent engineers, senior divisional engineers and engineers who had extensive knowledge in the project execution of similar projects were selected as key informants. A checklist was prepared and distributed to them for their responses The responses obtained through KII were analyzed. Relative Importance Index (RII) was calculated to find out the effective delay minimizing measures. The most effective delay minimizing measure was found to be penalizing the contractors for unreasonable delay of contracts. Setting contract duration according to the size of contract amount and considering geographical location while setting the contract duration were also rated as highly effective measures. Likewise host of other measures like improving bid capacity evaluation criteria, awarding contracts to middle order bidders for minimizing tendency of low bidding, slicing contracts into smaller packages, accuracy in fixing work scope to avoid design revisions, setting time limits on the basis of the affecting factors, solving land accusation issues prior to project execution were also identified as viable measures to avoid contract delays.
References
Reference
Mishra A K, Bhandari S, Jha T. Factors affecting performance and time extension of ongoing
construction projects under town development fund, Nepal. J Adv Res Const Urban Arch, 2018; 3(4):, 7-25.
Ghimire S, Mishra A K. Comparative study of prospective delay analysis techniques (DATs). Saudi J Civ Eng, 2019; 3(5):, 84-95.
Mishra AK, Aithal PS. Financial Impact Assessment of Time Overrun: A Case of Second Small Towns Water Supply and Sanitation Sector Project, Nepal. Int J Appl Eng Manag Lett (IJAEML). 2020;4(2):159-173.
Mishra AK. Project management: theory and practice from different countries. Tamilnadu: DK International Research Foundation. 2020. DOI:http://doi. org/10.5281/zenodo.4817542.
Mishra AK, Aithal PS. Causes and Effects of Design Change of Construction Projects. Int J Appl Eng Manag Lett (IJAEML). 2022;6(1):87-99. ISSN: 2581-7000. DOI: https://doi.org/10.5281/zenodo.6085346.
Anderson S D,Tucker R L. Improving project management of design. Journal of Management in Engineering, 1994; 10(4):, 35-44.
Odeh AM, Battaineh HT. Causes of construction delay: Traditional contracts. Int J Proj Manag. 2001;20(1):67– 73.
Love PED, Smith J, Simpson I, et al. Understanding the landscape of overruns in transport infrastructure projects. Environ Plann B Plann Des. 2015;42(3):490– 509.
Bahadur KC, Mishra AK. Bidding Trends of Contracts based on Types and Sizes of Projects under Road Divisions Butwal and Shivapur. J Adv Res Const Urban Arch. 2019;4(3&4):7-16.
Sauden A, Mishra AK, Aithal PS. Assessing the Seeds of Disputes in Projects. Int J Case Stud Bus IT Educ (IJCSBE). 2022;6(2):538-552. DOI: https://doi.org/10.5281/ zenodo.7348289
Mishra AK. Dispute Resolution Practice of Project Management in Nepal. J Adv Res BusiLaw Tech Mgmt. 2018;1(4):1-11. DOI: https://doi.org/10.5281/ zenodo.7288359.
Mishra AK, Mandal L, Pant RR. Causes of dispute in international competitive bidding road contracts funded by Asian Development Bank in Nepal. J Adv Res Busi Law Technol Manage. 2018;1(3):5-16.
Mishra AK, Singh NK. A Review on Time and Cost Issues of Infrastructure Projects. J Adv Res Constr Urban Arch. 2018;3(1-2):32-46.
Mishra AK, Sudarsan JS, Nithiyanantham S. Assessment of Time–Cost Model of Public Health Buildings in Nepal. Asian J Civil Eng. 2021;22(1):13-22. DOI: https://doi. org/10.1007/s42107-020-00294-4.
Al-Hazim N, Abusalem Z. Delay and cost overrun in road construction projects in Jordan. Int J Eng Technol. 2015;4(2):288.
Senouci A, Ismail A, Eldin N. Time Delay and Cost Overrun in Qatari Public Construction Projects. Procedia Eng. 2016 [cited 2023 Oct 22];164(June):368–375. Available from: http://dx.doi.org/10.1016/j.proeng.2016.11.632
Shrestha PP, Burns LA, Shields DR. Magnitude of Construction Cost and Schedule Overruns in Public Work Projects. J Constr Eng. 2013;(2):1–9.
Kaliba C, Muya M, Mumba K. Cost escalation and schedule delays in road construction projects in Zambia. Int J Proj Manag. 2009 [cited 2023 Oct 22];27(5):522– 531. Available from: http://dx.doi.org/10.1016/j.ijproman.2008.07.003
Maharjan S, Mishra A K, Aithal P S. Association between Delay, Project Size and Low Bid Percentage. International Journal of Applied Engineering and Management Letters (IJAEML), 2023; 7(2):, 216-231. DOI: https://doi.org/10.5281/zenodo.8142656
Aibinu AA, Jagboro GO. The effects of construction delays on project delivery in Nigerian construction industry. 2002;20:593–599.
Sambasivan M, Soon, Y W. Causes and effects of delays in Malaysian construction industry. International Journal of project management, 2007; 25(5):, 517-526.
Kikwasi G. Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania. Australasian J Constr Econ Build - Conf Ser. 2017;1(2):52.
Nepal MP, Park M, Son B. Effects of Schedule Pressure on Construction Performance. J Constr Eng Manag. 2006;132(2):182–188.
Aziz RF, Abdel-hakam AA. Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal. 2016 [cited 2023 Oct 22]. Available from: http://dx.doi.org/10.1016/j.aej.2016.03.006
Santoso DS, Ph D, Soeng S. Analyzing Delays of Road Construction Projects in Cambodia: Causes and Effects. 2012:1–11.
Assaf SA, Al-Hejji S. Causes of delay in large construction projects. Int J Proj Manag. 2006;24(4):349–357.
Herbsman Z, Ellis R. Multiparameter bidding system— innovation in contract administration by Zohar Herbsman and Ralph Ellis. 1992;118(1):142–150. https://doi.org/10.5281/zenodo.8142656
DoR. Statistics of National Highway (SNH) 2020/21. Available at: https://nepalindata.com/resource/ Statistics-Of-National-Highway--2020-21/.